New construction, how long should I wait before paving?

2 February 2023

You have just built a house and you are wondering how long it is wise to wait before paving the driveway? Paving a driveway is a very important part of the process to ensure its durability and aesthetics. Find out in our next article the details and tips for a successful paving.

Waiting time?

Most experts suggest waiting at least six months after your home is built before paving your driveway. This period allows the soil to stabilize and adjust to changes in temperature and humidity. These factors must be considered, as soil movement and changes in temperature and humidity can cause cracks and warping in the asphalt if it is set too early.
Waiting six months also gives you time to plan and determine a budget for paving. This allows you to take into consideration the costs of paving the entrance, such as labour and materials, and include them in your overall construction budget.

When is the best time?

The best time to have your driveway paved is during the warm season, which is between early June and late September. It is risky to do this type of work between December and April because soils can warp due to temperature variations (thaw). It is critical to be careful if a contractor offers to carry out the work outside of this period, as this may be an alarming sign as to the quality and seriousness of his service. It is advisable to ask an expert or other contractors if you have any doubts.

Choosing the right contractor

It is also important to choose an experienced and competent contractor to pave your driveway. It is best to research and ask for references before choosing a contractor. Check the company’s background and make sure they have the experience to do a quality job.

Maintenance

It is essential to take care of the maintenance of the asphalt once it has been installed. This means avoiding parking heavy vehicles in the driveway, washing with hot water, and letting it dry completely before washing again, and avoiding putting chemicals such as winterizing salts on the asphalt. By following these steps, you can guarantee that your asphalt will last a long time and stay beautiful.

In summary, it is suggested to wait at least six months after the construction of your home before paving your driveway for questions of its durability and aesthetics. Pavage Massie has been established in the Outaouais region since 1983. If you have any questions about your driveway or any asphalt project, our team will be happy to answer them!